Title: W● Bank New Building ELV in Vientiane(Laos)
Project Period ( from MAY, 2014 to NOV, 2016 )
EGM was in charge of the ICT construction of the W● Bank New building that Hansol Gongyoung built as the main operator. There are Structured Cabling, CCTV, Access Control, Fire alarm, A/V system, Network System, and Connectivity between all systems.